Moisture first
Boards and backing have to be sound before pretty tile goes on.
Service
Tub-to-shower conversions, tile that can take steam, vanities with storage, and layouts that make a five-foot bath feel finished. We keep one working bath in the house whenever the floor plan allows it.

Boards and backing have to be sound before pretty tile goes on.
Membranes, slopes, and grout lines are the job, not an afterthought.
A pretty vanity that holds nothing is a missed visit.
We plan the dark week so you are not improvising at a gym shower.
Four even steps, same on a bungalow or a two-story. You get photos when the work is done, not a vague “all set” text.
Photos, dimensions, and the constraint that will drive the calendar.
Materials, trades, and the messy bits, not just the pretty bits.
Demo through finish with a tidy site at the end of each day.
Punch list in person, then closeout notes.

Baths from the 80s and 90s often hide water at the tub surround. We budget time to see that before the new pan goes in. Glass, fixtures, and paint are sequenced so the last week is finish, not demolition in disguise.
A full bath is often a few weeks, not a few days. The proposal shows a range.
Yes. Moving a toilet or shower drain is a bigger conversation and a bigger number.
Yes, when the wall depth allows it.
Possible. Lead time on electrical and product goes on the calendar.
Tell us the address and the work on your mind. We reply with timing and a plain-language estimate, no hard sell.